Hennig West
Machesney Park, IL
With over 125,000 square feet, this $17 million facility houses packing operations for Hennig's backup power generators. The facility will include lasers, folding machines, and other state-of-the-art equipment to help Hennig meet the demand for backup power.
Ad-Tech Medical Instruments
Oak Creek, WI
Growth of a Wisconsin grown medical instrument manufacturer leads to this new 30,700 Sq. Ft. facility with state-of-the-art equipment. Cantilevered canopies, clerestory main entry and rooftop screenwalls add interest to the front offices. In back; a modular cleanroom manufacturing facility is surrounded by steel braces and columns, roof joists and vertical wall girts with horizontal metal panel exterior to create a building within a building.
Gold Medal Lofts
Racine, WI
This 111,000 square foot remodel turned what was previously a 120-year old Gold Medal Furniture Manufacturing Plant into a 77-unit apartment complex featuring a mix of studio, one, two, and three bedroom rentals. The development was designed to keep to the industrial feel of the original building by refurbishing existing brick walls and timber columns, and through the use of high ceilings with exposed metal piping.
Daily Reporter Top Project 2020
Dulmes Decor Carpet One
Sheboygan, WI
This 2-story, 35,000 square foot renovation created a new carpet and flooring warehouse and showroom for Dulmes Decor. The structure is timber framed with wood joists and decking, and this renovation included additions to support a 14’ overhead door as well as structural calculations to remove 3 interior columns while maintaining the structural integrity of the building.
Miller Motors
Burlington, Wisconsin
This commercial remodel expanded the offices at Miller Motors, giving them a larger break room, locker room, and waiting/reception area.